Rehabilitation of 10 slopes along the railway line Nikšić-Podgorica

Project title Rehabilitation of 10 slopes along the railway line Nikšić-Podgorica (EBRD (40344)-MNE-RIOM-SER-S2-2017-A1)
Project description The project will require the preparation of measures for the protection of slopes and rock falls on uphills, unstable slopes at some 50 locations along 56.8 km of the railway line between Niksic and Podgorica. The total length required for stabilization and slope protection measures is estimated at 12.3 km. The slopes are about 20 m high.
Funding source EBRD (European Bank for Reconstruction and Development) and Client
Current status After the preparation of the Main Design, a company will be chosen to perform works of the rehabilitation of priority slopes.