Project title |
Supply and installation of switch heaters km 25/0.22 KV for station Nikšić and station Ostrog on the railway line Nikšić-Podgorica (Contract No.EBRD 8032-IFT-40344-DC)
|
Project description |
It is planned, for the entire station (s), the command and signaling operation of the electric heating system of the switches united through the control cabinet in the station building. It is planned to connect the energy part of the device from two substations with power supply from the contact network, for the station Niksic, and from one substation with power supply of the contact network, for the station Ostrog. The aim of the project is to eliminate the freezing of the switches and the retention of the snow between the glade and the main rail, which is the cause of the displacement of the glade or impossibility of their attaching.
|
Funding source |
EBRD - European Bank for Reconstruction and Development
|
Contractor |
AŽD Praha s.r.o.- Czech Republic
|
Supervision |
Internal supervision made by RIoM
|
Contract work value
|
EUR 419,691.48 VAT excluding
|
Supervision contract value
|
|
Commencement of project implementation
|
III quarter 2017.
|
Deadline for work completion
|
I quarter 2018.
|
Current status
|
Works have been finished. Final handover of works and equipment to RIoM as final beneficiary has been made on 23.02.2018 when warranty period began .
|