Location |
1.Rehabilitation and regulation of water flow in the zone of RC bridge over river Štitarička km 324 + 491.28 between station Mojkovac and passing point Trebaljevo along the railway line Vrbnica – Bar; 2. Rehabilitation of culvert in area of passing point Trebaljevo (km 331+026), L=2,0m; 3. Rehabilitation of culvert in the location of Trebaljevo (km 333+593), L=22,10m; 4. Rehabilitation of culvert and regulation of water flow in the zone of viaduct km 335 + 193.68 between passing point Trebaljevo and station Kolašin along the railway line Vrbnica-Bar; 5. Rehabilitation of culvert on the railway line Vrbnica – Bar, section Kolašin – Kos km 341 + 034 L = 4.0m; 6. Rehabilitation and regulation of water flow of river Cijevna in the zone RC bridge km 412 + 065.65 between station Podgorica and Golubovci along the railway line Vrbnica - Bar; 7. Rehabilitation of culvert on the railway line Vrbnica-Bar, section Sutomore-Bar km 449 + 832 L = 34.0 m; 8. Rehabilitation and regulation of water flow in the zone of RC bridge km 452 + 258.80 between station Sutomore and Bar along the railway line Vrbnica – Bar. |
---|---|
Project description | Activities: Execution of works and supervision Aim of the project is to remedy the negative effects of erosion and floods and to regulate the river bed in the bridge zone, as well as to repair culvert damages . The planned rehabilitation measures of culvert (depending on the construction site): reinforcement of arch by reinforced concrete, injection of cracks by epoxy resin, filling of cracks and local damages of the arch with reparative mortar, extension of the arch, etc. The planned rehabilitation measures of the water flow (depending on the construction site): regulation of river beds in the bridge zone; repair of the part of the embankment of the pin by the construction of the retaining wall; rehabilitation of damages of river beds by stone fling, lean concrete, gabions; protection of pillars against scouring. |
Funding source | EBRD – European Bank for Reconstruction and Development |
Contractor | IGP Fidija d.o.o. Podgorica |
Supervision | RAIng d.o.o. Podgorica |
Work contract value | EUR 542,795.80 VAT excluded |
Supervision contract value | EUR 15,945.00 VAT excluded |
Project implementation commencement | III quarter2017 |
Deadline for work completion | III quarter 2018 |
Current status | According to the information of the Supervision about 95% of the total value of the contracted works were realized. |